Project Management Acronyms Decoded: From WBS to CPI

Decode project management acronyms with an illustrated office-move case, worked schedule and earned value examples, in a free 30-page PDF.

Project Fundamentals

What does a project manager need to know when a supplier asks for the WBS, a scheduler flags the critical path, or finance reports a CPI of 0.89? This illustrated English handbook follows one office move from the first scope discussion to the sponsor’s cost review. Each spread of information fits on a single numbered page, with an abbreviation, its full name, a line you might hear in a meeting and a decision you can practise.

Follow the move from its first quote

The opening case sounds simple. The office needs 24 installed desks, but the supplier has quoted for delivery. The WBS identifies the work, the statement of work defines the supplier’s commitment, and acceptance criteria give the facilities lead a way to check delivery. Later pages show what happens when someone requests six extra desks after the original price has been agreed.

The procurement and governance pages connect each abbreviation to an action. Readers compare a request for a proposed solution with a request for a comparable price, check a purchase order against delivery records, and decide who can authorise a change beyond the project manager’s delegated limit. The quality pages distinguish an inspection of installed desks from a review of the installation process.

Work through the network and risk examples

The move has two parallel jobs before system testing. Desk assembly takes three days and cabling takes five. When separate crews are available and testing needs both jobs to finish, the two-day test can end at elapsed day seven. The example shows which branch has float and how the answer changes when the controlling branch slips.

A separate risk example asks whether to reserve a backup lift. The team compares a possible delay with a reservation fee and the remaining likelihood of disruption. Readers see why comparing the fee alone with the largest possible loss misses part of the decision.

Interpret one consistent cost report

The earned value pages use an approved budget of $120,000 and one Friday reporting cutoff. Planned value is $60,000, earned value is $48,000 and actual cost is $54,000. Readers can trace the same numbers through the schedule variance, cost variance and efficiency ratios. Two forecasts show how the assumptions about future costs change the answer. The final page turns the numbers into a short sponsor report with follow-up decisions.

Page-by-page reference

  1. WBS — Work Breakdown Structure
  2. SOW — Statement of Work
  3. RACI — Responsible, Accountable, Consulted, Informed
  4. RAID — Risks, Assumptions, Issues, Dependencies
  5. RFP / RFQ — Request for Proposal / Request for Quotation
  6. PO — Purchase Order
  7. CR — Change Request
  8. CCB — Change Control Board
  9. QA / QC — Quality Assurance / Quality Control
  10. UAT — User Acceptance Testing
  11. FS / SS — Finish-to-Start / Start-to-Start
  12. PDM — Precedence Diagramming Method
  13. CPM / TF — Critical Path Method / Total Float
  14. PERT — Program Evaluation and Review Technique
  15. EMV — Expected Monetary Value
  16. SLA — Service Level Agreement
  17. BAC — Budget at Completion
  18. PV — Planned Value
  19. EV — Earned Value
  20. AC — Actual Cost
  21. CV — Cost Variance
  22. SV / SPI — Schedule Variance / Schedule Performance Index
  23. CPI — Cost Performance Index
  24. EAC / ETC — Estimate at Completion / Estimate to Complete
  25. VAC — Variance at Completion
  26. TCPI — To-Complete Performance Index
  27. PMIS — Project Management Information System

Frequently asked questions

Who is the handbook for?

It is designed for new project managers, project coordinators and team members who need to interpret abbreviations in meetings, contracts, schedules or status reports. The vocabulary is explained through a running case with numbers and assumptions shown beside the examples.

Can I use the pages as a quick reference?

Yes. Each content page has a named PDF bookmark. Open the entry for an abbreviation to find its full name, the worked situation and a practical question to take back to your team.

What is included in the download?

The PDF contains 30 pages in total, with a cover, 27 numbered content pages and two full-page advertisements. The templates advertisement follows content page 5 and the Coursera Plus advertisement follows content page 15. Promotional links may earn Coursya a commission. A purchase is optional.