Coursya originals · Free PDF ebook

A Complete Project in 25 Pages: From Idea to Handover

A complete fictional two-room booking pilot in twenty-five PDF pages, connecting business case, charter, scope, schedule, budget, earned value, change, issue response, acceptance and handover.

Project Fundamentals

A complete fictional two-room booking pilot in twenty-five PDF pages, connecting business case, charter, scope, schedule, budget, earned value, change, issue response, acceptance and handover.

Follow one consistent set of records from an eleven-day baseline through a test defect, an authorised day-twelve finish and a reconciled final cost of 8,600 against BAC 8,700. The later benefit review remains with the operating owner.

One project from idea to handover

Follow a small, fully connected case rather than isolated templates. Start with a problem and a measurable intended benefit. Define the commitment and who can change it. Name the people who provide inputs, deliver work and accept the result.

Room users need realistic booking scenarios and clear instructions. The operating lead needs support, access and recovery arrangements. IT needs a confirmed hosting and licence basis.

04 / Define scope and acceptance

Make the pilot small enough to plan and specific enough to judge. Use a work breakdown to check coverage before scheduling activities. Make time and cost assumptions reviewable. Calculate dates from the agreed dependencies.

A finishes at 2; B at 4; C at 7; D at 9; E at 8; F starts at max(9, 8) and finishes at 11. The controlling sequence is A-B-C-D-F.

08 / Approve the cost baseline

Reconcile work costs, contingency and total funding. Focus the register on decisions and practical actions. Keep the working records small, current and connected. Convert the approved plan into acknowledged commitments.

Procure the specified entitlement for 600 through the agreed route. Record its acceptance and operating conditions before configuration relies on it. Avoid assuming a purchase alone proves technical readiness.

12 / Deliver through working day seven

Track accepted work packages and their actual cost. Use the same scope and cutoff for budget, value and forecast. Protect the agreed pilot boundary through a visible decision. A risk that occurs needs an issue response and a new forecast.

Testing now occupies three days from day 7 to day 10, including correction and regression. E finishes at day 8. F can start only at day 10 and now finishes at day 12.

16 / Authorise the response and revised date

Choose the practical outcome with the correct authority. Acceptance requires evidence for the version that will be used. Use the final activity to test operation with support in place. The receiving owner needs practical control, not only documents.

The operating lead owns the service, support review and future benefit measurement. IT support owns the agreed technical escalation. Confirm that each owner can actually perform the continuing responsibility.

20 / Close cost and capture the lesson

Reconcile the final outcome against both original and revised commitments. Use the connected record trail to practise your own project decisions.

Original finish 11, revised finish 12. Work estimate 8,000 plus contingency 700 gives BAC 8,700. Actual 8,600 leaves 100 favourable completion variance; total funding remains 10,000.

Contents

  1. One project from idea to handover
  2. 01 / Build the business case
  3. 02 / Authorise a compact charter
  4. 03 / Confirm stakeholders and roles
  5. 04 / Define scope and acceptance
  6. 05 / Build a deliverable structure
  7. 06 / Record the estimate basis
  8. 07 / Sequence the six activities
  9. 08 / Approve the cost baseline
  10. 09 / Turn risks into responses
  11. 10 / Set communication and control
  12. 11 / Kick off and secure the input
  13. 12 / Deliver through working day seven
  14. 13 / Report the day-seven position
  15. 14 / Assess an additional feature
  16. 15 / Resolve a real test defect
  17. 16 / Authorise the response and revised date
  18. 17 / Verify the corrected result
  19. 18 / Run the monitored pilot
  20. 19 / Hand over the operating service
  21. 20 / Close cost and capture the lesson
  22. 21 / Rebuild the complete case

Using the PDF

Each numbered page contains an explanation, an original worked situation and a practical action. The bookmarks navigate the learning pages. A templates advertisement follows content page 5 and a Coursera Plus advertisement follows content page 15. The entire advertisement image is linked. Promotional links may earn Coursya a commission. A purchase is optional.

Frequently asked questions

Who is this guide for?

A complete fictional two-room booking pilot in twenty-five PDF pages, connecting business case, charter, scope, schedule, budget, earned value, change, issue response, acceptance and handover.

How can I practise the ideas?

Follow the running case, work through the page actions and use the PDF bookmarks to revisit a topic. The final learning pages help you apply the decisions to your own project.

What does the download contain?

The PDF contains 25 pages, including 22 numbered learning pages, a cover and two linked advertisements. The book is written in English.

Share this article