Twenty project KPIs with explicit formulas, reporting boundaries, worked calculations and interpretation, covering milestones, earned value, quality, response actions, capacity and flow.
Use a metric card before adding a number to a dashboard. The examples show both the calculation and the limits of its meaning, including a shared earned-value snapshot and clear cohort definitions.
Define the measure before calculating
A KPI becomes useful when it supports a decision with comparable evidence. Measure due milestones against their committed dates. Show how much unfinished work has passed its due date. Count accepted outputs while keeping their different sizes visible.
Six of ten scoped deliverables have acceptance records. Rate = 6 / 10 x 100 = 60%. Four still need work or acceptance; the measure says nothing about their relative effort.
04 / Schedule performance index
Compare earned and planned value at the same status date. Compare the value earned with the cost incurred. Express the earned-value cost difference in money. Compare the approved completion budget with the current total forecast.
A bottom-up ETC of 56,000 plus AC of 54,000 gives EAC 110,000. VAC = 100,000 – 110,000 = -10,000.
08 / Forecast overrun percentage
Express a projected completion overrun relative to the approved budget. Track which agreed requirements have acceptance evidence. Measure outputs accepted without returning for correction. Follow a defined group of defects to a stated cutoff.
Fifteen valid defects were logged during the release test. By the review cutoff, twelve are verified closed. Cohort closure rate = 12 / 15 x 100 = 80%.
12 / Rework effort percentage
Show the recorded effort used to correct completed or attempted work. Measure elapsed decision time for a defined set of requests. Test whether due commitments were completed by their agreed dates. Track delivery of the responses already agreed for risks.
Twelve response actions are due by the review. Eight are complete. Completion rate = 8 / 12 x 100 = 66.7%, rounded to one decimal place.
16 / Capacity allocation ratio
Compare assigned effort with the capacity actually available. Count completed work items over a defined period. Measure elapsed time from the workflow’s start point to its finish point. Measure elapsed time for work that has started but has not finished.
An unfinished item started at noon on 27 October. At noon on 31 October, its age is four calendar days. It has no completed cycle time yet.
20 / Positive stakeholder response rate
Use a clear survey definition and disclose who responded. Twenty available measures do not require twenty dashboard tiles.
The shared snapshot has SPI 0.90, CPI about 0.83 and forecast overrun 10%. These signal investigation; the causes and options still require work-package and schedule evidence.
Contents
- Define the measure before calculating
- 01 / Milestone on-time rate
- 02 / Overdue open-task rate
- 03 / Accepted-deliverable rate
- 04 / Schedule performance index
- 05 / Cost performance index
- 06 / Cost variance
- 07 / Variance at completion
- 08 / Forecast overrun percentage
- 09 / Requirements acceptance coverage
- 10 / First-pass acceptance yield
- 11 / Defect cohort closure rate
- 12 / Rework effort percentage
- 13 / Mean change-request turnaround
- 14 / Action on-time closure rate
- 15 / Risk-response action completion
- 16 / Capacity allocation ratio
- 17 / Throughput
- 18 / Mean cycle time
- 19 / Work-item age
- 20 / Positive stakeholder response rate
- Choose a small decision-focused set
Using the PDF
Each numbered page contains an explanation, an original worked situation and a practical action. The bookmarks navigate the learning pages. A templates advertisement follows content page 5 and a Coursera Plus advertisement follows content page 15. The entire advertisement image is linked. Promotional links may earn Coursya a commission. A purchase is optional.
Frequently asked questions
Who is this guide for?
Twenty project KPIs with explicit formulas, reporting boundaries, worked calculations and interpretation, covering milestones, earned value, quality, response actions, capacity and flow.
How can I practise the ideas?
Follow the running case, work through the page actions and use the PDF bookmarks to revisit a topic. The final learning pages help you apply the decisions to your own project.
What does the download contain?
The PDF contains 25 pages, including 22 numbered learning pages, a cover and two linked advertisements. The book is written in English.


