STAGE 1: Observe the flow
Concept: Separate processing time from waiting time.
Task: Map intake, inspection and completion; state the unit of analysis and measurement window.
Acceptance: A process map shows queues, handoffs and rework loops.

My assumptions:

My work / file link:

My checks and results:

What I changed:


STAGE 2: Find the constraint
Concept: System output is limited by the bottleneck under the stated model.
Task: Use stage capacities to estimate daily throughput and identify the constraint.
Acceptance: Do not add stage capacities together as total system throughput.

My assumptions:

My work / file link:

My checks and results:

What I changed:


STAGE 3: Test an improvement
Concept: A local efficiency gain may not improve the whole process.
Task: Compare increasing intake capacity with reducing inspection rework.
Acceptance: Quantify the assumption behind each option and possible downstream effects.

My assumptions:

My work / file link:

My checks and results:

What I changed:


STAGE 4: Plan measurement
Concept: An improvement claim needs a baseline and a stable measure.
Task: Design a two-week pilot with throughput, queue age and rework measures.
Acceptance: Record demand changes that could explain the apparent improvement.

My assumptions:

My work / file link:

My checks and results:

What I changed: